# Spatial scheduling
|
||||
|
||||
`ScheduleAndRealizeSpatial` selects one scheduling strategy after constructing
|
||||
the shared `ComputeGraph`. Pipeline scheduling does not run, require, or repair
|
||||
a latency PEFT placement.
|
||||
The [scheduling overview](../../../../../../../../docs/compiler/scheduling.md)
|
||||
documents ownership, costs, capacity recovery, complexity, and links to the
|
||||
normative invariants. See [implementation details](../../../../../../../../docs/compiler/scheduling-implementation.md)
|
||||
for fragment views, receive forwarding, transfer rounding, and placement models.
|
||||
|
||||
## Ownership and flow
|
||||
|
||||
| Decision | Owner |
|
||||
| --- | --- |
|
||||
| Compute instances, dependency extraction, execution/transfer costs, resident-weight identities | `ComputeGraph` and `ComputeInstanceUtils` |
|
||||
| Target configuration and physical link costs | Compiler target adapter, exposed through `SchedulingTarget` |
|
||||
| Latency priorities, reservations, physical assignment, insertion gaps, per-core order | `PeftScheduler` |
|
||||
| Capacity-driven additive workload splitting | `PipelineWorkloadPreparation` |
|
||||
| Operation groups, stage adjacency and input constraints | `buildPipelineGroups` |
|
||||
| Stage partitioning | `partitionPipelineGroups` |
|
||||
| Stage core budgets | `assignPipelineStages` |
|
||||
| Physical topology clustering | `PipelineCoreLayout` |
|
||||
| Stage-local placement and resident-weight packing | `packPipelineStages` and `IndexedResidentWeights` |
|
||||
| Schedule timing evaluation | `evaluateSchedule` |
|
||||
| Publication-compatible core equivalence classes | `populateScheduleEquivalenceClasses` |
|
||||
| Emission of the selected core order and homogeneous runs | Scheduled compute planning/materialization |
|
||||
| Routing, local forwarding and transfer families | Deferred transfer planning |
|
||||
| Deadlock-free blocking communication order | Deferred communication scheduling |
|
||||
| READY/FREE counts, registers, overwrite boundaries and restart synchronization | Deferred boundary planning |
|
||||
| Explicit communication and synchronization operations | Deferred boundary realization |
|
||||
|
||||
Both strategies produce `MergeScheduleResult`: physical core assignment,
|
||||
contiguous per-core execution slots, estimated starts, last-task markers,
|
||||
equivalence classes and cost summaries. Pipeline schedules also provide the
|
||||
stage of every physical core. Graph identity identifies publications; it does
|
||||
not order execution. Materialization sorts only by the verified scheduler slots
|
||||
and combines only consecutive compatible graph instances.
|
||||
Class lanes keep graph encounter order independently of physical core IDs,
|
||||
preserving regular source-lane mappings without changing any core's execution
|
||||
order. Complete singleton fragment publications use reshape views only with
|
||||
matching static shapes, zero offsets, complete sizes and unit strides, including
|
||||
scalar fragments. Other insertions retain their slice semantics. Receive forwarding
|
||||
runs after copy normalization and can cross lookup-table loads, while writes
|
||||
and synchronization remain barriers.
|
||||
|
||||
Physical fragment slots are resolved through `getGraphBatchPublicationMap`.
|
||||
Direct statically evaluable batch projections can have many-to-many edges.
|
||||
Unproven projections retain the complete producer dependency. Blueprint
|
||||
dependencies belong to the shared graph, rather than a separate pipeline-only
|
||||
dependency graph.
|
||||
Sources reached through intermediate projections retain conservative producer
|
||||
dependencies, including region captures. Graph construction reports malformed
|
||||
publication metadata through normal pass failure.
|
||||
Projected communication costs count the selected physical fragments through
|
||||
the same publication map; graph-range overlap is not a transfer-volume estimate.
|
||||
Conservative costs scale payload bytes before rounding memory/packet costs, so
|
||||
small fragments retain endpoint and packet overhead. Conservative producer-chunk
|
||||
payloads scale elements/bits before byte rounding, preserving one aggregate
|
||||
chunk estimate; projected publication costs retain their per-fragment granularity.
|
||||
Spatial sub-byte types reach analysis, while the current PIM byte-addressed
|
||||
communication lowering rejects non-byte-sized element storage.
|
||||
|
||||
## Cost dimensions
|
||||
|
||||
Execution times and fixed transfer costs use integer nanoseconds. Hardware
|
||||
cycles are converted using the corresponding target period. Bytes, elements,
|
||||
flits, resident-weight slots and lane counts remain resource quantities.
|
||||
Blueprint reconstruction charges memory work separately for each fragment;
|
||||
small projected slices are not assumed to require a single copy. Full receives
|
||||
that can write directly into assembly storage do not charge endpoint memory work
|
||||
again on their edges. Later copy elimination can make this assembly estimate
|
||||
conservative. Blueprint reconstruction uses target memory read/write costs; element counts
|
||||
and cycles are not added to nanoseconds. Runtime-free views cost zero.
|
||||
Runtime transposes charge target memory read/write traffic rather than generic
|
||||
nested-operation fallback cost. Their shared lowering/run analysis charges rounded
|
||||
memory accesses per run and vector execution for strided runs. The matched oracle
|
||||
charges vector payload bytes, not the full strided address footprint. Instruction
|
||||
setup/issue time and contention remain approximation boundaries.
|
||||
Concatenation charges each input block separately
|
||||
for each outer row, including memory-width rounding. Axis, size and target-period
|
||||
scaling have focused coverage.
|
||||
|
||||
The evaluator distinguishes total serial work, maximum per-core work,
|
||||
dependency critical path, summed edge transfer latency, single-inference
|
||||
completion and individual stage spans. The dependency path excludes core-order
|
||||
constraints; completion includes them. Summed communication is a work metric,
|
||||
not elapsed time. Stage spans exclude cross-stage routing, restart/host-buffer
|
||||
synchronization and network contention. They are scheduling proxies, not an
|
||||
authoritative prediction of steady-state throughput. Simulator latency and
|
||||
measured throughput period remain the performance gates.
|
||||
|
||||
Partitioning retains its successful ordered-packing plus dependency-tail
|
||||
priority. This deliberately biases cuts away from long dependent groups and
|
||||
is not reported as predicted execution time. Pipeline partitioning and packing
|
||||
use nominal volume priorities: transpose traffic is weighted as a bulk movement,
|
||||
preserving the measured heuristic without pretending that individual runs are
|
||||
free. The per-operation priority adjustment is cached and scaled by chunk lanes.
|
||||
PEFT and final schedule evaluation always use physical execution estimates.
|
||||
Pipeline candidate placement compares
|
||||
maximum per-core serial compute/incident-transfer demand, then stage completion
|
||||
and compute load. Incident transfer latency is charged to each participating
|
||||
core as a placement proxy; it is not added twice to predicted elapsed time.
|
||||
This preserves useful parallelism that an arrival-time-only ranking can lose.
|
||||
The final reported compute/incident-transfer demand uses physical execution
|
||||
estimates, separately from the priority scores used to select the placement.
|
||||
When serial-demand estimates are within 1%, stage span breaks the near tie;
|
||||
this is a heuristic resolution rule, not a pipeline timing model. Core budgets
|
||||
come from stage allocation and capacity recovery. A proposed additional one-core
|
||||
load refinement was removed after a matched throughput regression; improving
|
||||
the placement proxy did not establish a better execution period.
|
||||
|
||||
## Capacity and recovery
|
||||
|
||||
The distinct-weight union divided by per-core capacity is a provable lower
|
||||
bound; an oversized task is individually infeasible. Ordered pack counts are
|
||||
heuristic core-budget estimates for unrestricted placement. Their failure does
|
||||
not prove hardware infeasibility. When these estimates exhaust the fleet, core
|
||||
allocation restarts from the lower bounds and actual packing establishes
|
||||
feasibility.
|
||||
|
||||
Latency reservations prioritize physical communication/load, or reuse under
|
||||
high weight pressure. If graph-order reservations fail, a largest-weight-first
|
||||
retry retains load-aware placement before using the shared reuse-first best-fit
|
||||
constructor. The constructor establishes feasibility; its concentrated assignment
|
||||
does not replace a successful load-aware reservation. Pipeline packing compares arrival-aware and load-aware placements;
|
||||
ordered packing and the same shared constructor supply constructive recovery
|
||||
assignments. Failed search budgets guide bounded core reallocation, but are not
|
||||
resource lower bounds. Diagnostics distinguish a proved capacity limit from an
|
||||
unsuccessful heuristic search. No exact combinatorial solver is used.
|
||||
The shared constructor retries once in reverse order after greedy failure.
|
||||
Only if both orders fail, it replays at most16 single-choice deviations with a
|
||||
shared budget of65536 core-candidate checks, reusing its scratch buffers.
|
||||
Successful existing assignments are preserved; exhausted repair is not proof of
|
||||
infeasibility. PEFT propagates reservation failures to the scheduling pass for
|
||||
a bounded diagnostic and normal pass failure.
|
||||
|
||||
## Complexity
|
||||
|
||||
Let `T` be tasks, `E` dependencies, `P` processors, `G` operation groups, `S`
|
||||
stages, `R` resident-weight references, `W` distinct weights and `C` total modeled
|
||||
work.
|
||||
|
||||
- Schedule evaluation takes `O((T + E) log T + P)` time with deterministic ready
|
||||
ordering, and `O(T + E + P)` space.
|
||||
- Resident-weight indexing retains `O(R W)` worst-case equality comparisons.
|
||||
Lower bounds take `O(R + W)` time and `O(W)` bits. Constructive best fit takes
|
||||
`O(T log T + P R + P W)` time, with `O(P W)` bits and `O(T + P)` additional
|
||||
storage. It runs on failure paths rather than replacing successful placement.
|
||||
Recovery adds at most17 constructions with the same complexity (one reverse
|
||||
traversal plus16 single-choice replays); repair candidate checks are also
|
||||
capped at65536. Scratch storage is reused, with one extra `O(T)` failed-assignment
|
||||
snapshot only after both original attempts fail.
|
||||
- The partition DP remains superlinear: up to
|
||||
`O(S G² ((T + R) log C + W))` time for ordered segment estimates, plus group
|
||||
dependency traversal, and `O(S G²)` cache space. This bounded existing search
|
||||
is retained rather than replaced with global placement optimization.
|
||||
- Physical topology clustering and cached PEFT center distances take `O(P²)`
|
||||
time. Center lookups are constant time instead of repeating a full physical
|
||||
topology scan for each task/candidate processor.
|
||||
- Concatenation cost extraction takes `O(A D)` time and constant auxiliary space
|
||||
for `A` inputs of rank `D`; it does not expand the outer rows or copy blocks.
|
||||
- Graph execution costs are scaled by chunk lane counts. Pipeline priority
|
||||
analysis adds two cost traversals per operation template and caches the
|
||||
adjustment, taking `O(T + D)` time and `O(T + G)` space for `D` total template
|
||||
body operations. It does not revisit template bodies for every chunk.
|
||||
- Exact projection analysis visits each selected physical slot once per
|
||||
consumer chunk and input use, with a producer-lane bitset for deduplication.
|
||||
If `L` is producer lanes and `Q` is projected slot visits, it takes
|
||||
`O(Q + L)` time and `O(L + Q)` temporary space; publication maps are cached
|
||||
across all chunks. Cost extraction shares this traversal with dependencies.
|
||||
- Conservative producer tracing visits each value/projection once per input,
|
||||
including captured region operands, with linear time and space in that input's
|
||||
projection DAG. Direct physical-batch edges retain their existing fast path.
|
||||
- Pipeline mode removes a complete PEFT run, including its reservation and
|
||||
insertion-gap searches. Latency mode retains those algorithms and their
|
||||
existing potentially quadratic gap traversal.
|
||||
|
||||
Remaining approximation boundaries include operation issue overhead, eliminated
|
||||
assembly copies, communication contention and pipeline synchronization. Weight
|
||||
indexing and ready-transfer signature searches remain possible compiler
|
||||
hotspots. Changes to these require matched execution measurements.
|
||||
Implementation sources remain in this directory; project-wide compiler
|
||||
navigation starts at [docs/README.md](../../../../../../../../docs/README.md).
|
||||
|
||||