@@ -6,6 +6,24 @@ there; the details below describe current implementation choices.
## Publication, order, and local materialization
Deferred transfer planning allocates one host slot for repeated full-fragment
requirements with the same physical producer, payload type, and source slot.
One immutable producer result identifies one logical inference generation.
Scalar source projections retain separate publications until their exact
geometry has a common representation in both analyses.
Boundary planning moves a shared publication's notifications to its earliest
existing send boundary. The first notification stores the payload before READY;
later notifications emit READY only. Each reader retains its load and READY
count. FREE planning includes every physical reader before the first overwrite
of the shared slot. Existing unique writer-reader releases, register allocation,
capacity-driven FREE-group merging, and restart barriers remain in force.
Host-slot allocation and shared-boundary planning take expected linear time
and space in the number of physical consumer transfers. Structured send runs
retain compact per-lane store flags. They do not duplicate payload shaping
for notification-only readers.
[`materializeScheduledCompute`](../../src/PIM/Dialect/Spatial/Passes/Transforms/MergeComputeNodes/ScheduledComputeMaterialization.cpp) records
graph IDs for publication identity, not execution order. Class lanes retain
graph encounter order independently of physical core IDs, preserving regular
@@ -65,10 +83,14 @@ remain approximations, not extra inferred memory traffic.
[`PipelineScheduling.cpp`](../../src/PIM/Dialect/Spatial/Passes/Transforms/MergeComputeNodes/Scheduling/PipelineScheduling.cpp) caches a per-template
adjustment between physical execution cost and nominal volume priority, scaling
it by chunk lanes. Partitioning and packing use the nominal priorities;
transposes count as bulk moves there. PEFT, final schedule evaluation, and
reported per-core demand use physical estimates. These quantities must not be
substituted for one another when interpreting results.
it by chunk lanes. The original partitioning and packing candidate uses nominal
priorities; transposes count as bulk moves there. The memory-aware candidate
uses execution estimates for partitioning, retaining the existing core-budget
and packing heuristics. Final
selection evaluates bounded alternatives after physical placement, retaining
the original candidate when the combined resource estimates worsen. PEFT,
final schedule evaluation, and reported per-core demand use physical estimates.
These quantities must not be substituted for measured simulator periods.
Placement compares maximum per-core serial compute plus incident same-stage
transfer demand, then completion/span and compute load. Each participating core
+40 -5
View File
@@ -57,8 +57,37 @@ paths exclude core-order constraints; completion includes them. Stage spans
exclude cross-stage routing, restart/host synchronization, and contention.
Simulator latency and measured throughput remain the performance gates.
Pipeline partitioning uses ordered-packing/dependency-tail priorities and
nominal movement volumes. PEFT and final evaluation use physical cost estimates.
Pipeline scheduling retains the original ordered-packing/dependency-tail
heuristic using nominal movement volumes. A second search uses execution
estimates and aggregate serialized shared-memory service, minimizing their
maximum. Its DP keeps at most eight compute/memory trade-offs per state;
four final alternatives and the initial partition undergo the existing core
allocation, topology placement, and capacity verification. The phase-1 winner
remains a fallback. A second bounded search accounts for shared publications.
Selection retains the fallback unless the modeled bottleneck improves. Selection also requires that
shared-memory service plus maximum stage span does not increase. The same
check applies to shared-memory service plus maximum per-core compute work.
These guards limit compute imbalance; their sums do not predict simulator
periods. Sharing-aware alternatives must also preserve maximum stage span,
because placement-dependent baseline loads remain approximate. PEFT is unchanged.
`ComputeGraph` retains physical publication and consumer identities separately
from aggregated dependency edges. Cross-stage demands charge one store per
shared physical publication and one load per consumer transfer. Publication
identity includes the immutable result generation, exact payload type, and
physical source fragment. Scalar projections retain separate stores
conservatively. Same-stage local/direct transfers incur no host traffic.
Function inputs, constants, and outputs supply a separate baseline estimate.
The target adapter supplies access width and read/write service times; request
rounding precedes aggregation. Serialized service is shared by all stages and
is not added to individual stage spans. Baseline loads remain approximate
before placement, bufferization, aliasing, and load folding.
Scalar publication stores round each contiguous source run separately.
Consumer load counts can remain conservative before load folding.
The scheduler evaluates boundary demand again after physical placement.
Full graph fragments resolve to unique physical producers, so their sharing
does not depend on reader placement. Deferred planning uses the same identity
rule and retains separate loads, including repeated loads on one reader core.
Placement ranks maximum per-core compute/incident-transfer demand, then stage
completion and compute load; within 1% demand, stage span breaks the tie.
These are placement heuristics, not a steady-state timing model.
@@ -81,7 +110,8 @@ proved hardware infeasibility.
## Complexity and limits
Let `T` be tasks, `E` dependencies, `P` cores, `G` groups, `S` stages,
`R` weight references, `W` distinct weights, and `C` modeled work.
`R` weight references, `W` distinct weights, `C` modeled work, `F` physical
fragment/consumer demands, and bounded frontier size `K = 8`.
| Analysis | Time / storage |
|---|---|
@@ -89,13 +119,18 @@ Let `T` be tasks, `E` dependencies, `P` cores, `G` groups, `S` stages,
| Weight indexing | Up to `O(R W)` equality comparisons |
| Weight lower bounds | `O(R + W)` / `O(W)` bits |
| Constructive best fit | `O(T log T + P R + P W)` / `O(P W)` bits plus `O(T + P)`; bounded retries only on failure |
| Partition DP | Up to `O(S G² ((T + R) log C + W))` plus dependency traversal / `O(S G²)` cache |
| Partition DP | Up to `O(S G² ((T + R) log C + W + K³))` plus dependency traversal / `O(S G² + S G K)`; at most five additional physical placements per memory objective |
| Cut memory service | Expected `O(F + G)` time / `O(F + G)` scratch and retained demands |
| Topology clustering / cached PEFT distances | `O(P²)` time |
| Concat cost extraction | `O(A D)` for `A` inputs of rank `D`; constant auxiliary space |
| Cached pipeline priorities | `O(T + D)` time / `O(T + G)` space for `D` template-body operations |
| Exact projections | `O(Q + L)` time/temporary space for `Q` slot visits and `L` producer lanes; publication maps cached |
| Exact projections | `O(Q + L)` time for `Q` slot visits and `L` producer lanes; repeated demands aggregate by projection and fragment |
| Conservative producer tracing | Linear in the input projection DAG, including captures |
Latency insertion-gap searches can remain quadratic. Issue overhead,
eliminated assembly copies, contention, and pipeline synchronization remain
cost approximations. Changes require matched execution measurements.
Loop-invariant projections use trip-count multiplication. Loop-invariant
resident weights are collected once. Loop-dependent projections and weights
can still require iteration visits; retained projection demands scale with
distinct physical fragments instead of repeated visits.