# Spatial scheduling
`ScheduleAndRealizeSpatial` constructs a shared `ComputeGraph`, then selects
latency PEFT or pipeline scheduling. Pipeline mode does not run PEFT.
See [implementation notes](scheduling-implementation.md) for fragment-view eligibility,
receive forwarding, transfer rounding, cost-model boundaries, and recovery limits.
## Ownership
| Responsibility | Owner |
|---|---|
| Instances, dependencies, execution/transfer costs, resident weights | `ComputeGraph`, `ComputeInstanceUtils` |
| Target resources and physical link costs | Compiler target adapter via `SchedulingTarget` |
| Latency priorities, reservations, placement, per-core order | `PeftScheduler` |
| Capacity-driven workload splitting | `PipelineWorkloadPreparation` |
| Groups, stage partitioning, core budgets | `buildPipelineGroups`, `partitionPipelineGroups`, `assignPipelineStages` |
| Topology clustering and stage-local packing | `PipelineCoreLayout`, `packPipelineStages`, `IndexedResidentWeights` |
| Timing evaluation and publication equivalence | `evaluateSchedule`, `populateScheduleEquivalenceClasses` |
| Selected execution order and homogeneous runs | Scheduled compute planning/materialization |
| Routing, forwarding, blocking communication order | Deferred transfer planning and communication scheduling |
| READY/FREE counts, registers, overwrite/restart boundaries | Deferred boundary planning/realization |
Both strategies produce `MergeScheduleResult`: core assignments, contiguous
per-core slots, estimated starts, last-task markers, equivalence classes, and
cost summaries. Pipeline results also assign each core a stage. Materialization
uses verified slots for execution order and merges only consecutive compatible
instances. Graph/class lane identity does not imply core identity or execution
order.
Dependencies and transfer costs share `getGraphBatchPublicationMap`.
Statically proven physical-slot projections support many-to-many edges;
unproven projections retain complete producer dependencies, including region
captures. Malformed publication metadata fails graph construction.
Normative contracts:
[graph fragments](../../.agents/invariants/GRAPH_COMPUTE_BATCH_INVARIANT.md),
[pipeline stages](../../.agents/invariants/PIPELINE_SCHEDULING_INVARIANT.md),
[target boundary](../../.agents/invariants/SPATIAL_TARGET_GENERALITY_INVARIANT.md),
[synchronization](../../.agents/invariants/PIM_SYNCHRONIZATION_INVARIANT.md),
and [performance](../../.agents/invariants/PERFORMANCE_OPTIMIZATION_INVARIANT.md).
## Costs and interpretation
Execution and fixed transfer costs use integer nanoseconds, converted from
target cycles. Bytes, elements, flits, weight slots, and lanes remain resource
quantities. Memory work is rounded at its actual fragment/run granularity;
runtime-free views cost zero. Transposes charge memory traffic and strided
vector work; concatenation charges per-input blocks per outer row. Direct
receives into assembly storage avoid duplicate endpoint-memory charges.
Sub-byte storage is analyzable in Spatial but rejected by byte-addressed PIM
communication lowering.
The evaluator separates serial work, per-core work, dependency critical path,
summed transfer work, single-inference completion, and stage spans. Dependency
paths exclude core-order constraints; completion includes them. Stage spans
exclude cross-stage routing, restart/host synchronization, and contention.
Simulator latency and measured throughput remain the performance gates.
Pipeline partitioning uses ordered-packing/dependency-tail priorities and
nominal movement volumes. PEFT and final evaluation use physical cost estimates.
Placement ranks maximum per-core compute/incident-transfer demand, then stage
completion and compute load; within 1% demand, stage span breaks the tie.
These are placement heuristics, not a steady-state timing model.
## Capacity and recovery
Distinct-weight union / per-core capacity is a lower bound; an oversized task
is infeasible. Ordered pack counts estimate budgets, and failed heuristic
packing does not prove infeasibility. Exhausted budgets restart from lower
bounds and constructive packing establishes feasibility.
Latency reservations try load/communication-aware placement, then
largest-weight-first and shared reuse-first best fit on failure. Pipeline
packing compares arrival/load-aware candidates and uses constructive recovery.
The shared constructor retries in reverse order, then at most 16 single-choice
deviations within 65,536 core-candidate checks. Successful placements are
preserved. Exhausted search produces a bounded diagnostic, not a claim of
proved hardware infeasibility.
## Complexity and limits
Let `T` be tasks, `E` dependencies, `P` cores, `G` groups, `S` stages,
`R` weight references, `W` distinct weights, and `C` modeled work.
| Analysis | Time / storage |
|---|---|
| Schedule evaluation | `O((T + E) log T + P)` / `O(T + E + P)` |
| Weight indexing | Up to `O(R W)` equality comparisons |
| Weight lower bounds | `O(R + W)` / `O(W)` bits |
| Constructive best fit | `O(T log T + P R + P W)` / `O(P W)` bits plus `O(T + P)`; bounded retries only on failure |
| Partition DP | Up to `O(S G² ((T + R) log C + W))` plus dependency traversal / `O(S G²)` cache |
| Topology clustering / cached PEFT distances | `O(P²)` time |
| Concat cost extraction | `O(A D)` for `A` inputs of rank `D`; constant auxiliary space |
| Cached pipeline priorities | `O(T + D)` time / `O(T + G)` space for `D` template-body operations |
| Exact projections | `O(Q + L)` time/temporary space for `Q` slot visits and `L` producer lanes; publication maps cached |
| Conservative producer tracing | Linear in the input projection DAG, including captures |
Latency insertion-gap searches can remain quadratic. Issue overhead,
eliminated assembly copies, contention, and pipeline synchronization remain
cost approximations. Changes require matched execution measurements.