# Spatial scheduling
|
|
|
|
`prepareSpatialSchedules` constructs the shared `ComputeGraph`. Latency mode
|
|
uses PEFT. For `--pipeline > 1`, the PIM compiler selects among bounded pipeline
|
|
candidates with static queue-aware Spatial execution analysis. Pipeline mode does not run PEFT.
|
|
|
|
See [implementation notes](scheduling-implementation.md) for fragment-view eligibility,
|
|
receive forwarding, transfer rounding, cost-model boundaries, and recovery limits.
|
|
|
|
## Ownership
|
|
|
|
| Responsibility | Owner |
|
|
|---|---|
|
|
| Instances, dependencies, execution/transfer costs, resident weights | `ComputeGraph`, `ComputeInstanceUtils` |
|
|
| Target resources and physical link costs | Compiler target adapter via `SchedulingTarget` |
|
|
| Latency priorities, reservations, placement, per-core order | `PeftScheduler` |
|
|
| Capacity-driven workload splitting | `PipelineWorkloadPreparation` |
|
|
| Groups, stage partitioning, core budgets | `buildPipelineGroups`, `initialPipelinePartition`, `optimizePipelineSchedule` |
|
|
| Topology clustering and stage-local packing | `PipelineCoreLayout`, `packPipelineStages`, `IndexedResidentWeights` |
|
|
| Timing evaluation and publication equivalence | `evaluateSchedule`, `populateScheduleEquivalenceClasses` |
|
|
| Selected execution order and homogeneous runs | Scheduled compute planning/materialization |
|
|
| Routing, forwarding, blocking communication order | Deferred transfer planning and communication scheduling |
|
|
| READY/FREE counts, registers, overwrite/restart boundaries | Deferred boundary planning/realization |
|
|
|
|
Both strategies produce `MergeScheduleResult`: core assignments, contiguous
|
|
per-core slots, estimated starts, last-task markers, equivalence classes, and
|
|
cost summaries. Pipeline results also assign each core a stage. Materialization
|
|
uses verified slots for execution order and merges only consecutive compatible
|
|
instances. Graph/class lane identity does not imply core identity or execution
|
|
order.
|
|
|
|
Dependencies and transfer costs share `getGraphBatchPublicationMap`.
|
|
Statically proven physical-slot projections support many-to-many edges;
|
|
unproven projections retain complete producer dependencies, including region
|
|
captures. Malformed publication metadata fails graph construction.
|
|
|
|
Normative contracts:
|
|
[graph fragments](../../.agents/invariants/GRAPH_COMPUTE_BATCH_INVARIANT.md),
|
|
[pipeline stages](../../.agents/invariants/PIPELINE_SCHEDULING_INVARIANT.md),
|
|
[target boundary](../../.agents/invariants/SPATIAL_TARGET_GENERALITY_INVARIANT.md),
|
|
[synchronization](../../.agents/invariants/PIM_SYNCHRONIZATION_INVARIANT.md),
|
|
and [performance](../../.agents/invariants/PERFORMANCE_OPTIMIZATION_INVARIANT.md).
|
|
|
|
## Costs and interpretation
|
|
|
|
Execution and fixed transfer costs use integer nanoseconds, converted from
|
|
target cycles. Bytes, elements, flits, weight slots, and lanes remain resource
|
|
quantities. Memory work is rounded at its actual fragment/run granularity;
|
|
runtime-free views cost zero. Transposes charge memory traffic and strided
|
|
vector work; concatenation charges per-input blocks per outer row. Direct
|
|
receives into assembly storage avoid duplicate endpoint-memory charges.
|
|
Sub-byte storage is analyzable in Spatial but rejected by byte-addressed PIM
|
|
communication lowering.
|
|
|
|
The evaluator separates serial work, per-core work, dependency critical path,
|
|
summed transfer work, single-inference completion, and stage spans. Dependency
|
|
paths exclude core-order constraints; completion includes them. Stage spans
|
|
exclude cross-stage routing, restart/host synchronization, and contention.
|
|
Simulator latency and measured throughput remain the performance gates.
|
|
|
|
Throughput scheduling uses one bounded joint optimizer. Initialization groups all
|
|
lanes of an operation and computes one ordered partition with a prefix DP.
|
|
The DP jointly assigns operation prefixes and at most sixteen units of spare
|
|
core capacity. Each configured stage reserves one physical core. Quantization
|
|
limits initialization only; refinement uses geometric core transfers, including one core.
|
|
If the quality grid has no feasible state, a minimum-resource prefix DP checks
|
|
every physical core count for each segment. This preserves feasibility over
|
|
the segment assignments found by the constructive packers, independently of
|
|
resource quantization. Packing failure remains a bounded-search limitation,
|
|
not proved hardware infeasibility.
|
|
The seed minimizes maximum stage packing/dependency priority over the legal
|
|
active-stage counts within the configured depth. These priorities provide
|
|
a starting point, not a timing guarantee. Refinement can remove stage boundaries.
|
|
No empty stage is inserted between dependent operations.
|
|
|
|
Every proposed partition receives a minimax core budget for its changed stages.
|
|
Unchanged stages retain their budgets. The allocator builds
|
|
constructive ordered-packing curves and uses reuse-first resident-weight packing
|
|
when order alone cannot realize a capacity bound. A feasible packing remains
|
|
feasible with idle extra cores. All placements pass the existing topology-aware
|
|
physical packing, operation-group, adjacency and capacity checks.
|
|
Ordered packing returns an unavailable cost when no ordered assignment fits.
|
|
Every finite feasibility cost has an ordered or reuse-first constructive assignment.
|
|
Initialization retains that assignment before adding idle spare cores. If topology-aware
|
|
greedy placement and reconstruction in physical task order fail, it uses the
|
|
retained assignment.
|
|
Task reordering cannot discard the initial partition's constructive capacity evidence.
|
|
This evidence does not prove final backend legality.
|
|
|
|
Refinement uses a beam of two schedules ranked by the larger queue estimate.
|
|
Its ordered neighborhood moves operation groups across adjacent stage boundaries,
|
|
inserts a boundary, or removes consecutive boundaries.
|
|
Refinement preserves contiguous groups in the initialization's topological order.
|
|
Coalescing compacts later stages. Each changed block redistributes its core pool.
|
|
Core coordinates also transfer powers of two between stages, including one core.
|
|
These moves cross packing plateaus within a bounded number of evaluations.
|
|
The configured pipeline depth and total physical resources remain fixed.
|
|
|
|
A cheap proxy ranks the neighborhood before physical packing and queue analysis.
|
|
It uses ordered-packing curves, dependency spans and aggregate shared-memory demand.
|
|
Refinement uses the target's existing per-operation execution costs, rather than
|
|
redistributing aggregate processor work across operations.
|
|
Processor service and critical recurrence contributions guide ties toward affected bottlenecks.
|
|
The PIM adapter supplies target-neutral processor guidance from the shared periodic
|
|
graph. PIM timing semantics remain outside Spatial.
|
|
|
|
The optimizer evaluates at most thirty-two complete Spatial queue costs and attempts
|
|
at most 128 constructive allocations and physical packings.
|
|
Each round evaluates at most two new placements.
|
|
Each retained parent receives one queue-evaluation opportunity per round.
|
|
The first round can evaluate two neighbors of its single parent.
|
|
The two best evaluated schedules form the next beam.
|
|
All evaluated schedules remain available for final comparison.
|
|
Search stops at the evaluation or
|
|
packing budget, or when the beam's legal unvisited neighborhood is exhausted.
|
|
Canonical stage/budget vectors, physical core order and evaluation index break
|
|
ties deterministically. Actual physical placements, including inactive-core
|
|
stage identities, are deduplicated. The final 2.1% near-equivalence policy compares
|
|
the retained queue estimates. There are no independent legacy, sharing-aware,
|
|
allocator-only or boundary-shift candidate-generation policies.
|
|
|
|
Unavailable timing, unsupported static forms or unproved recurrence explicitly
|
|
stop a costed search. They are not silently discarded. One operation group or
|
|
one distinct neighborhood schedule skips optional queue comparison and lowers
|
|
once. Final backend resource retries remain restricted to already costed schedules.
|
|
|
|
`ComputeGraph` retains physical publication and consumer identities separately
|
|
from aggregated dependency edges. Cross-stage demands charge one store per
|
|
shared physical publication and one load per consumer transfer. Publication
|
|
identity includes the immutable result generation, exact payload type, and
|
|
physical source fragment. Scalar projections retain separate stores
|
|
conservatively. Same-stage local/direct transfers incur no host traffic.
|
|
Function inputs, constants, and outputs supply a separate baseline estimate.
|
|
The target adapter supplies access width and read/write service times; request
|
|
rounding precedes aggregation. Serialized service is shared by all stages and
|
|
is not added to individual stage spans. Baseline loads remain approximate
|
|
before placement, bufferization, aliasing, and load folding.
|
|
Scalar publication stores round each contiguous source run separately.
|
|
Consumer load counts can remain conservative before load folding.
|
|
The scheduler evaluates boundary demand again after physical placement.
|
|
Full graph fragments resolve to unique physical producers, so their sharing
|
|
does not depend on reader placement. Deferred planning uses the same identity
|
|
rule and retains separate loads, including repeated loads on one reader core.
|
|
Placement ranks maximum per-core compute/incident-transfer demand, then stage
|
|
completion and compute load; within 1% demand, stage span breaks the tie.
|
|
These are placement heuristics, not a steady-state timing model.
|
|
|
|
## Periodic dependency diagnostics
|
|
|
|
`--pim-periodic-diagnostics` writes `reports/pipeline_periodic.json` after deferred
|
|
boundary planning. This diagnostic does not change schedule selection or IR.
|
|
It consumes the cached compute-instance costs, materialized core order, physical
|
|
transfer families, publication store flags, and allocated READY/FREE registers.
|
|
Compute runs remain atomic; their lanes and loop iterations are not expanded.
|
|
Compact runs require one physical core; multi-core classes use per-lane steps.
|
|
One event sequence represents each physical core. The model retains one planned
|
|
load per physical consumer transfer and one store per shared publication.
|
|
Later load folding or strided transfer splitting can change request granularity.
|
|
|
|
Edges express `t(v,k) >= t(u,k-d) + w`. Within-generation edges have distance
|
|
zero. Each core's completion-to-entry edge has distance one. Reader-entry FREE
|
|
signals therefore release the preceding generation through that edge. Signals
|
|
join their exact planned WAIT count. Dissemination barriers, restart permissions,
|
|
and the downstream release tree retain their core identities and order.
|
|
The diagnostic checks its event-register summary against the emitted program
|
|
in the synchronization tests; it does not replace deadlock verification.
|
|
|
|
The injected target describes direct-transfer completion and link, local-memory,
|
|
shared-memory, and signal timing. The current adapter specifies peer permission
|
|
before a source read. SEND completion follows the read and payload enqueue;
|
|
RECV completion also requires payload delivery and a destination write.
|
|
Unsupported or incomplete target timing produces an `unavailable` report.
|
|
|
|
The analysis brackets the maximum cycle ratio within one nanosecond. It tests
|
|
edge delays `w - II*d`, sweeping the distance-zero DAG between recurrence
|
|
relaxations. A positive predecessor cycle can terminate an infeasible probe early.
|
|
The final witness pass retains the full relaxation procedure and deterministic
|
|
witness selection. At most `R+1` sweeps detect a positive cycle, where `R` counts
|
|
positive-distance edges. Bisection uses at most 64 tests. Timing outside the
|
|
supported numeric range produces an explicit unavailable result. A predecessor
|
|
cycle supplies a witness, including delay, iteration distance, cores, and links.
|
|
Detailed witness output is limited to 128 edges; totals cover the entire cycle.
|
|
|
|
The reported interval estimate is the maximum of the modeled recurrence,
|
|
per-core compute work, and aggregate serialized shared-memory service. Memory
|
|
service is never assigned a fixed global request order. Taking the maximum
|
|
does not add the same service twice. The within-generation dependency span is
|
|
reported separately and is not an initiation interval.
|
|
|
|
These are conditional estimates for the abstract execution model, not exact
|
|
simulator predictions or guaranteed physical lower bounds. Serial compute costs
|
|
can overestimate overlapping work. Baseline memory accesses retain their
|
|
aggregate service bound, but their positions are not modeled. Communication
|
|
introduced after deferred realization, including final output collection, is
|
|
also absent. Instruction issue, local contention, network injection queues, and
|
|
memory arbitration remain unmodeled. Missing effects are listed in the report;
|
|
`selection_eligible` remains false. This plan-level diagnostic does not rank
|
|
production candidates. Production extracts execution events from realized Spatial
|
|
and evaluates them with the shared queue engine.
|
|
|
|
For `V` events, `E` edges, and `R` recurrence edges, construction requires
|
|
`O(T + F + S log S)` time and `O(V + E + S)` storage, for existing compute
|
|
instances `T`, physical transfers `F`, and synchronization events `S`.
|
|
Analysis requires `O(L (R+1) (V+E))` time and `O(V+E)` storage, where `L <= 64`.
|
|
Here `R` is at most the number of active physical cores. There is no dense
|
|
all-core dependency matrix or inference-generation unrolling.
|
|
For `C` analyzed candidates, time scales by `C`; scratch storage can be reused.
|
|
The current diagnostic analyzes only the selected schedule (`C = 1`).
|
|
|
|
### Post-codegen instruction diagnostic
|
|
|
|
`raptor-periodic` provides an explicit, read-only diagnostic over an emitted
|
|
binary artifact. It accepts native or oracle-exported artifacts. Use the
|
|
oracle-exported artifact when comparing against Pimsim performance results:
|
|
|
|
```bash
|
|
build_release/Release/bin/raptor-periodic /tmp/model/pimsim_nn \
|
|
--pim-target-config=validation/pimsim_configs/pimcomp/arch-a/throughput_config_1000ms.json \
|
|
--core-count=168 --crossbar-count=96 --crossbar-size=128 > /tmp/periodic.json
|
|
```
|
|
|
|
The diagnostic uses physical instruction files and their array-group map.
|
|
Each file owns one physical core's work, including all lanes and static loop
|
|
iterations already emitted there. It does not expand compiler loops or batches.
|
|
It replaces Spatial compute costs rather than adding instruction costs to them.
|
|
The lightweight compiler report remains separate and does not invoke this tool.
|
|
|
|
The supported execution contract requires ROB capacity one. Non-scalar
|
|
instructions therefore retain their serial execution order. Local compute and
|
|
blocking memory runs become weighted chunks between communication events.
|
|
Every emitted global request contributes its actual size, rounding, and count.
|
|
Inputs, constants, split transfers, folded loads, and output collection are
|
|
included through their emitted instructions. Their positions relative to
|
|
communication remain explicit. The global service bound remains separate;
|
|
the model does not impose an order on different cores' global requests.
|
|
|
|
Timing queries reuse the injected memory, link, and matrix definitions.
|
|
PIM instruction semantics belong to the compiler target adapter. Vector
|
|
writeback follows the oracle's actual width rules. Matrix writeback uses the
|
|
physical array-group width. Local-memory timing uses its own configured period.
|
|
The oracle passes `vector_latency_cycle` directly to a nanosecond wait.
|
|
This parameter does not scale with the processor period; no separate vector
|
|
clock exists in the supported oracle configuration.
|
|
In the current oracle, global loads return zero network payload bytes.
|
|
Global stores retain their outgoing payload cost.
|
|
|
|
The source switch has one unbounded FIFO for outgoing requests. Enqueue does
|
|
not wait for earlier requests. FIFO dispatch waits for their completion.
|
|
Direct SEND requires permission delivery before the source read. Its payload
|
|
enqueue event coincides with source-read completion. SEND completes after
|
|
enqueue, independently of FIFO dispatch or payload delivery. RECV requires delivery and
|
|
destination write. Permission responses join both peer readiness and the
|
|
receiver's outgoing FIFO. SYNC delivery can precede its local completion.
|
|
The model retains WAIT counts, restart events, and cross-generation FIFO state.
|
|
It does not replace the compiler's synchronization or deadlock verification.
|
|
|
|
`--model-network-queues=false` and `--model-issue=false` support timing
|
|
comparisons. The latter omits scalar issue and retirement delays while retaining
|
|
SYNC's instruction-defined execution time. Completion notifications can join
|
|
the current edge before the clock process runs. The model uses minimum
|
|
retirement delays; it does not reproduce SystemC clock-phase ordering.
|
|
Scalar issue is charged serially, so these estimates are not guaranteed
|
|
physical lower bounds. The base recurrence estimate omits global arbitration,
|
|
frontend buffering, and initial bootstrap. Production does not rank candidates
|
|
with this recurrence-only estimate.
|
|
Reports with at most 128 events include `timing_graph` for focused timing checks.
|
|
Its dependencies distinguish payload enqueue from FIFO dispatch and delivery.
|
|
The instruction test accepts `--pimsim /path/to/ChipTest` for optional fast-mode
|
|
timing comparisons. These cover both hardware profiles and distinct processor,
|
|
local-memory, and vector latency settings.
|
|
|
|
For `N` emitted instructions, `F` direct transfers, `S` synchronization events,
|
|
and `P` active cores, construction takes `O(N + (F+S) log(F+S))` time.
|
|
The indexed graph uses `O(F+S+P)` space and at most `2P` recurrence edges.
|
|
Global requests are counted during the same scan without per-request graph
|
|
nodes. One instruction file is memory-mapped at a time. Maximum-cycle-ratio
|
|
analysis uses the same bounded algorithm as the lightweight diagnostic.
|
|
|
|
`--model-memory-controller` adds a separate `memory_controller` estimate.
|
|
Each global request retains its readiness, transport, service, and completion
|
|
dependencies. The controller serves requests in predicted arrival order.
|
|
Read and write requests share that FIFO. Zero-size requests also join it.
|
|
Source switches remain occupied until transport completion. The model does not
|
|
assign a fixed global request order or consume simulator trace order.
|
|
|
|
The analysis executes the indexed periodic graph with timestamped tokens.
|
|
FIFO tokens retain dependencies across generations; the graph is not copied.
|
|
A request arrival reserves the controller after earlier arrivals, and its
|
|
completion enables dependent events. Independent cores and switches remain
|
|
concurrent. The maximum-cycle-ratio solver and its report remain unchanged.
|
|
|
|
The queue estimate compares adjacent two-generation windows with the oracle's
|
|
one-percent convergence threshold. It reports the mean interval across both
|
|
windows. Per-core queue waits use the corresponding four completed body
|
|
generations. The maximum request wait includes bootstrap. Event-index order
|
|
resolves simultaneous readiness. A second run reverses that order and reports
|
|
`alternative_tie_interval_ns`. These two orders are sensitivity checks, not
|
|
bounds over every possible tie order. Clock phases and frontend overlap remain
|
|
approximate. The standalone report remains read-only.
|
|
Production evaluates Spatial-derived events with the shared queue engine.
|
|
|
|
For `R` global requests, the queue mode adds `O(R)` events and dependencies.
|
|
For `V` resulting events, `E` dependencies, and generation bound `K`, execution
|
|
takes `O(K(E + V log V))` time. Storage is `O(V + E + B)`, where `B` counts
|
|
pending tokens. The event heap contains at most one event per node. FIFO token
|
|
storage retains pending generations, rather than instruction-stream copies.
|
|
The diagnostic limits each event to 64 generations and processed events to
|
|
`16(V + E)`. It reports `unavailable` if either bound prevents convergence.
|
|
The two tie-order runs reuse the same graph. Production uses queue execution for costs and maximum-cycle-ratio analysis for bounded search guidance.
|
|
The standalone frontend retains the recurrence witness. Neither analysis changes latency PEFT.
|
|
|
|
## Default throughput selection
|
|
|
|
Full PIM code generation uses Spatial-only queue-aware selection for `--pipeline > 1`.
|
|
Latency PEFT and `--pim-only-codegen` retain their existing behavior.
|
|
Intermediate emission retains the initialized schedule and stops at its requested stage.
|
|
Its schedule can differ from the final program.
|
|
|
|
The compiler performs these steps:
|
|
|
|
1. Run the frontend, layout planning, and graph preparation once.
|
|
2. Construct one legal initial partition, allocate cores, and place its work.
|
|
3. Rank legal joint partition/allocation moves with inexpensive resource proxies.
|
|
4. Realize each admitted schedule in an independent clone of the prepared checkpoint.
|
|
5. Query the target adapter over realized Spatial IR, then release the clone.
|
|
6. Require supported static forms, available costs, and proved modeled recurrence.
|
|
7. Refine a two-schedule beam within thirty-two total queue evaluations.
|
|
8. Apply the existing 2.1% near-equivalence rule to the evaluated schedules.
|
|
9. Realize the selected schedule again from the unchanged checkpoint.
|
|
10. Lower, allocate, verify, and emit only the selected program.
|
|
|
|
A single candidate skips event extraction, queue analysis, recurrence proof, and comparison.
|
|
It is realized and lowered once, even when optional timing is unavailable.
|
|
No rejected candidate enters PIM IR or instruction generation during cost evaluation.
|
|
Constants and weights remain shared immutable attributes in the MLIR context.
|
|
Candidate operations, communication plans, and synchronization state remain independent.
|
|
No full candidate compilation directories are created.
|
|
|
|
`SchedulingTarget::estimateRealizedScheduleCost` is the read-only whole-schedule query.
|
|
Its typed result carries both intervals, recurrence evidence, static lowering support,
|
|
failure reasons, and the selection margin. Unknown support remains explicit.
|
|
The target supplies model evidence. Spatial applies the 2.1% selection policy margin.
|
|
Selection does not read JSON diagnostics. Reports serialize the typed results.
|
|
Spatial owns candidate generation, legality, placement, and target-neutral comparison.
|
|
The PIM adapter owns execution-event extraction, instruction timing, and resource contention.
|
|
Pimsim-nn omits `vsoftmax` before fetch, so the PIM queue model assigns it no timed work.
|
|
Input materialization, surrounding instructions, transfers, and synchronization retain their costs.
|
|
Functional simulation still executes Softmax. Estimated timing and energy exclude Softmax work.
|
|
The shared queue engine models controller arrival arbitration and cross-generation dependencies.
|
|
The compiler does not execute candidate programs or invoke a simulator.
|
|
|
|
Spatial extraction permits at most one million operation visits per physical core.
|
|
The total visit count is diagnostic; adding cores does not reduce another core's analysis allowance.
|
|
Abstract queue construction permits two million non-work event visits per candidate.
|
|
The complete-state recurrence limits remain unchanged.
|
|
|
|
Both arbitration policies must establish complete-state recurrence within bounded analysis budgets.
|
|
Their estimates are sensitivity checks, not formal bounds.
|
|
The candidate with the lowest larger estimate must separate from the initialized schedule.
|
|
Comparison uses `[min(ties)/1.021, max(ties)/0.979]`.
|
|
Close alternatives retain the initialized schedule. The 2.1% margin is a policy heuristic.
|
|
Spatial timing predictions have no formal accuracy bound.
|
|
The search finds the best distinguishable candidate in its bounded set, without global optimality.
|
|
|
|
Unavailable timing, unknown static support, or unproved recurrence stops a multi-candidate comparison.
|
|
The diagnostic identifies each affected candidate and property.
|
|
The compiler does not silently exclude unknown candidates or use instruction-level fallback selection.
|
|
|
|
Static preflight does not prove final backend legality.
|
|
The selected candidate runs through normal bufferization, allocation, and backend verification.
|
|
A backend owner can mark a resource-limit diagnostic as candidate-specific.
|
|
Currently, the local-memory allocator marks signed 32-bit address-space exhaustion.
|
|
The compiler discards that failed clone, explicitly records its rejection, and selects again from the remaining estimated schedules.
|
|
The first remaining schedule becomes the reference for the same selection policy.
|
|
Each schedule is attempted at most once. No graph or placement constraints are relaxed.
|
|
Unclassified or systemic backend failures stop compilation immediately.
|
|
Code-generation failures also stop compilation when recovery cannot be justified.
|
|
If every candidate fails, one diagnostic lists all attempted candidates and causes.
|
|
|
|
`reports/pipeline_selection.json` records Spatial costs, eligibility, selection, and backend attempts.
|
|
It also records search parents, compact task-stage runs, core budgets, recurrence contributions, termination, attempts, queue budget, and phase times.
|
|
Phase times separate neighborhood scoring, constructive packing, dependency-witness
|
|
analysis, and queue execution with its complete-state proof.
|
|
`--enable-timing` adds per-pass lowering times and IR operation/value counts.
|
|
Final instruction generation uses the normal compiler timing report.
|
|
Explicit Spatial exports and IR dumps reconstruct pre-lowering artifacts for the selected schedule.
|
|
They do not change the emitted program. Diagnostic MLIR dumps elide large constants and are not lossless checkpoints.
|
|
|
|
### Static analysis, diagnostics, and external validation
|
|
|
|
Production decisions use the input graph, compiler options, physical plans, and configured target parameters only.
|
|
Identical static inputs produce the same decision regardless of historical measurements.
|
|
There are no measured-latency caches, workload lookup tables, or fitted timing corrections.
|
|
|
|
`raptor-periodic` retains the instruction-derived analyzer as a standalone validation frontend.
|
|
It shares the same timing definitions and queue engine with Spatial event evaluation.
|
|
Optional diagnostics expose resource work, recurrence, and ordered-request fingerprints.
|
|
Offline Pimsim fast-mode runs validate predictions and emitted programs.
|
|
Simulator measurements never enter production selection.
|
|
|
|
For `C <= 32` candidates, scheduling metadata uses `O(C(T+P))` storage for `T` compute instances and `P` cores.
|
|
Placement deduplication costs `O(C²(T+P))` time. The beam retains at most two schedules.
|
|
A round streams legal boundary and core moves into a shortlist of at most `2C`.
|
|
Each parent builds stage resource and dependency summaries in `O(T+E+P)` time and storage.
|
|
Unchanged-stage packing costs use an `O(SP)` cache. Changed task lists are not cached.
|
|
Each parent proposes `O(G + S² log P)` group, cut, and core moves.
|
|
For `M` proposed assignments, cheap allocation and scoring cost
|
|
`O(M (T log T + S P + E + F + S Kpack))`, plus bounded shortlist comparisons,
|
|
where `Kpack` is one existing ordered-packing query's cost.
|
|
Constructive allocation builds at most `S P` ordered-packing queries per admitted
|
|
partition. The graph and weight indices are reused. Search performs at most
|
|
128 physical packings; queue costs remain capped at thirty-two.
|
|
Recurrence guidance uses the shared bounded maximum-cycle-ratio solver.
|
|
Candidate realization and extraction are sequential; complete candidate modules are not retained.
|
|
Normal successful compilation performs one candidate-specific backend lowering.
|
|
Recovery performs at most `C` lowerings. Retry selection costs `O(C²)` time and `O(C)` metadata.
|
|
The bounded queue-analysis costs are described in the implementation notes.
|
|
|
|
## Capacity and recovery
|
|
|
|
Distinct-weight union / per-core capacity is a lower bound; an oversized task
|
|
is infeasible. Ordered pack counts estimate budgets, and failed heuristic
|
|
packing does not prove infeasibility. Exhausted budgets restart from lower
|
|
bounds and constructive packing establishes feasibility.
|
|
|
|
Latency reservations try load/communication-aware placement, then
|
|
largest-weight-first and shared reuse-first best fit on failure. Pipeline
|
|
packing compares arrival/load-aware candidates and uses constructive recovery.
|
|
The shared constructor retries in reverse order, then at most 16 single-choice
|
|
deviations within 65,536 core-candidate checks. Successful placements are
|
|
preserved. Exhausted search produces a bounded diagnostic, not a claim of
|
|
proved hardware infeasibility.
|
|
|
|
## Complexity and limits
|
|
|
|
Let `T` be tasks, `E` dependencies, `P` cores, `G` groups, `S` stages,
|
|
`R` weight references, `W` distinct weights, `C` modeled work, `F` physical
|
|
fragment/consumer demands, and resource quantization `Q <= 16`.
|
|
|
|
| Analysis | Time / storage |
|
|
|---|---|
|
|
| Schedule evaluation | `O((T + E) log T + P)` / `O(T + E + P)` |
|
|
| Weight indexing | Up to `O(R W)` equality comparisons |
|
|
| Weight lower bounds | `O(R + W)` / `O(W)` bits |
|
|
| Constructive best fit | `O(T log T + P R + P W)` / `O(P W)` bits plus `O(T + P)`; bounded retries only on failure |
|
|
| Joint initialization DP | `O(G² Q Kpack + S G² Q²)` time / `O(G² Q + S G Q)` storage; `Kpack` is one constructive pack-cost query |
|
|
| Feasibility completion, only if the quality grid fails | `O(G² P Kpack + S G²)` time / `O(G² + S G)` additional storage |
|
|
| Neighborhood memory service | Expected `O(T + F)` per partition / `O(T + F)` scratch |
|
|
| Topology clustering / cached PEFT distances | `O(P²)` time |
|
|
| Concat cost extraction | `O(A D)` for `A` inputs of rank `D`; constant auxiliary space |
|
|
| Cached pipeline priorities | `O(T + D)` time / `O(T + G)` space for `D` template-body operations |
|
|
| Exact projections | `O(Q + L)` time for `Q` slot visits and `L` producer lanes; repeated demands aggregate by projection and fragment |
|
|
| Conservative producer tracing | Linear in the input projection DAG, including captures |
|
|
|
|
Latency insertion-gap searches can remain quadratic. Issue overhead,
|
|
eliminated assembly copies, contention, and pipeline synchronization remain
|
|
cost approximations. Changes require matched execution measurements.
|
|
Loop-invariant projections use trip-count multiplication. Loop-invariant
|
|
resident weights are collected once. Loop-dependent projections and weights
|
|
can still require iteration visits; retained projection demands scale with
|
|
distinct physical fragments instead of repeated visits.
|