Pipeline Scheduling Invariant

Scope

This invariant applies to pipeline stage partitioning, physical-core assignment, scheduled materialization, deferred transfers, and pipeline synchronization.

Invariant

A scheduled compute operation and all of its lanes belong to exactly one pipeline stage. An operation may consume results produced in its own stage or the immediately preceding stage only. Therefore every compute-graph edge from stage S targets stage S or S + 1; backward edges and dependencies that skip a stage are invalid.

Dynamic function inputs are stage-zero sources. Any operation that directly consumes one must belong to stage 0. A later stage may consume that data only through an explicit result forwarded by the preceding stage.

Each logical core belongs to exactly one stage capacity range before physical placement. Those ranges cover every core but may have different sizes when the initial partitioner predicts a lower maximum stage interval. Physical placement may map a stage to arbitrary core IDs using the injected target topology. Synchronization and deferred transfers consume the explicit stage identity; they must not infer it from a physical core number after placement.

Ownership

Logical PEFT remains pipeline-agnostic. Stage partitioning is the first phase of pipeline scheduling and owns this invariant. It must construct a valid operation-level partition before physical-core packing. Operations split for physical capacity retain one shared stage identity. Repacking may move work only within its assigned stage. Deferred-transfer planning and synchronization consume the verified stage assignment; they must not repair or reinterpret it.

Verification

Before scheduled materialization, verify that:

  • every compute instance has one valid physical core and stage;
  • all lanes of one compute operation have the same stage;
  • every direct dynamic-function-input consumer belongs to stage 0;
  • every compute-graph edge stays within a stage or advances exactly one stage;
  • every stage-local resident-weight set fits its assigned physical core; and
  • stage capacities cover all logical cores exactly once; and
  • physical placement is a permutation of all target cores.

Pipeline scheduling tests must include an uneven physical-core layout and a graph with a long-lived dependency that would cross multiple naive stage cuts. End-to-end validation must preserve functional results and exercise the existing synchronization lowering without simulator changes.